v1.3

Lifecycle Model

8 States

#StateDescription
1Dream / Vision SeedInitial spark, undefined form
2ExploratoryActive discovery, questions dominate
3ExplicatedIntent is articulated but not yet structured
4StructuredCanonical form filled, Canvas populated
5RealizablePassed Critical Readiness Threshold
6In RealizationActive execution
7EvolvingLive, receiving signals, adapting
8ArchivedNo longer active

Critical Readiness Threshold (CRT)

The gate between Structured and Realizable. Four conditions must be met:

  • Intent — Answered
  • Object — Answered
  • Constraints — Answered
  • Expected Output — Answered
  • Additionally, Specialized Readiness blocks (pattern-specific) must have no blocking unknowns.

    Non-Linear Development

    The lifecycle is not a waterfall. Allowed movements:

    • Return to earlier states for re-explication
    • Feedback loops from Evolving back to Structured (major change) or Realizable (minor update)
    • Skip from Dream directly to Exploratory or even Explicated

    Realization Decisions

    DecisionMeaning
    Ready for RealizationAll conditions met
    Ready for StructuringIntent clear, needs canonical form
    Needs ClarificationCritical gaps identified
    Blocked by ContradictionsConflicting requirements
    Blocked by Critical UnknownsMissing essential information
    Exploratory OnlyNot ready for any commitment